Most operational risk registers die quietly. They are created for an audit, populated with generic risks, scored once, and never opened again. The business keeps running, the risks keep changing, and the document becomes evidence of a process that does not exist.
A working register is different. It is short enough to read in ten minutes, specific enough to assign to a named person, and connected to the meetings where resources are allocated. It does not try to catalogue every possible event. It tracks the risks that could stop the business, damage customers or breach a legal obligation.
The short version
- Identify risks by process, not by imagination; walk the work and ask what breaks it.
- Score likelihood and impact on a simple scale, and separate inherent from residual risk.
- Give every risk one owner with authority to act.
- Record the control, its evidence and the treatment plan with a date.
- Review monthly or quarterly, and retire risks that no longer exist.
What the register is for
The register is a decision tool. It answers three questions: what could go wrong, how bad would it be, and who is doing something about it. It is not a guarantee that nothing will go wrong, and it is not a substitute for controls, insurance or a business continuity plan.
Keep the scope operational: people, processes, systems, suppliers, facilities and legal compliance. Strategic and financial risks can sit in a separate register if the business needs one. Mixing everything into a single list makes it long and unfocused.
Identify by walking the process
Start with the processes that deliver the product or service. For each, ask:
- What input could fail or arrive late?
- What step depends on one person, one system or one supplier?
- Where could a human error create a customer or legal impact?
- What would happen if the process stopped for a day, a week or a month?
- What has gone wrong before, including near misses?
Include external events that are plausible for the location and sector: severe weather, utility failure, cyber incident, supplier insolvency, regulatory change. Do not include speculative catastrophes that the business cannot influence or prepare for; they add noise without action.

Score with a simple scale
A five-point scale is enough. Define likelihood and impact in words so that different departments score consistently:
| Score | Likelihood | Impact |
|---|---|---|
| 1 | Rare, less than once in five years | Minor inconvenience, under 1% of annual profit |
| 2 | Unlikely, once in two to five years | Noticeable disruption, 1 to 3% of profit |
| 3 | Possible, roughly annual | Serious disruption, 3 to 10% of profit |
| 4 | Likely, several times a year | Major loss, 10 to 25% of profit or a regulatory breach |
| 5 | Almost certain, monthly or more | Existential, over 25% of profit, licence or reputation |
Score inherent risk before controls and residual risk after controls. The gap between the two is the value of the control. If there is no gap, either the control is ineffective or the scoring is optimistic.
Assign one owner
Every risk needs a named owner, not a department. The owner is accountable for the control and the treatment plan, and has the authority to spend within an agreed limit or escalate. A risk owned by "the team" is owned by nobody.
The owner does not have to do all the work. They are responsible for making sure it happens and for reporting the status.
Record the control and the evidence
A control is a specific activity that reduces likelihood or impact. "We have a backup process" is not a control. "Nightly encrypted backups to a separate region, restored and tested quarterly, with the last test date recorded" is a control.
For each control, note the evidence: a log, a checklist, a test result, a training record. Evidence is what turns a claim into an auditable fact. It also makes the register useful during an incident, when people need to know what was supposed to happen.

Choose a treatment
There are four options:
- Avoid: stop the activity that creates the risk.
- Reduce: change the process, add a control or build redundancy.
- Transfer: insure or contract the risk to another party, acknowledging that reputation and continuity risk usually remain.
- Accept: document why the cost of treatment exceeds the benefit, and monitor.
Each treatment plan needs an action, an owner and a date. "Improve supplier resilience" is not a plan. "Qualify a second supplier for the packaging component by 31 March, with a trial order in February" is.
An example register
| Risk | Owner | Inherent | Control | Residual | Action |
|---|---|---|---|---|---|
| Single supplier for a critical component | Operations lead | 4 x 4 = 16 | Buffer stock of four weeks | 3 x 3 = 9 | Qualify second supplier by Q2 |
| Ransomware stops order processing | IT manager | 3 x 5 = 15 | Backups, MFA, endpoint protection | 2 x 4 = 8 | Test restore and incident plan in March |
| Key person leaves without a successor | Managing director | 3 x 4 = 12 | Documented processes, deputy appointed | 2 x 3 = 6 | Cross-train second engineer by Q3 |
| New privacy rule affects customer data | Legal counsel | 3 x 4 = 12 | Data map and retention policy | 2 x 3 = 6 | Review consent wording by September |
The scores are not precise, and they do not need to be. Their purpose is to rank attention and show movement over time.

Make the review real
Review the register in a standing meeting, not in a separate risk committee that nobody attends. Fifteen minutes monthly is enough if the register is short. Discuss new risks, changes in scores, overdue actions and any incident or near miss from the period.
Use key risk indicators where they exist: supplier lead times, staff turnover, incident counts, backup test results, complaint volumes, audit findings. An indicator that moves is a reason to revisit the score, not a substitute for judgement.
Retire risks that are no longer relevant. A register that only grows becomes unreadable and loses credibility.
A risk register is not a list of fears. It is a list of decisions that have been made about what to protect and what to accept.

The takeaway
Keep the register short, specific and owned. Identify risks by walking the work, score them on a simple scale, record the control and its evidence, and give every action a name and a date. Review it in a meeting where decisions are made. That is the difference between a document and a working control.







